description: Sidecat, LLC seeks approval for a 620,000-square-foot data center in Jersey Township, Ohio, with plans for significant investment and local job creation.
image: https://cdn.prod.website-files.com/66525ec138843cc1ccb1c325/68c301ebaa36be33aa2af8f7_1a3f16114a452999cc4d7d6b36ae1602_Obedio%20march%20of%20progress.png
---

[Skip to content](https://hs.getobedio.com/blog/metas-project-mink-data-center-goes-to-licking-county-planners-with-14-conditions-attached#main-content)

[![Obedio logo with black text and an orange graphic composed of four circles and a diagonal arrow pointing up and right.](https://cdn.prod.website-files.com/66525ec138843cc1ccb1c325/66529844eddaa630d6da1b42_obedio%20gold%20for%20white%20background.png)](https://getobedio.com)

[Team](https://www.getobedio.com/team) [Pricing](https://www.getobedio.com/pricing) [Contact](https://www.getobedio.com/demo) [Blog](https://www.getobedio.com/blog) [Login](https://obed.io/v4/login)

Local Ordinance Data Center ohio

# Meta’s 500MW Project Mink Data Center Goes to Licking County Planners With 14 Conditions Attached

![Obedio research](https://7528315.fs1.hubspotusercontent-na1.net/hub/7528315/hubfs/raw_assets/public/mV0_d-cms-elevate-theme_hubspot/elevate/images/avatar-placeholder.jpg?width=48&height=48&name=avatar-placeholder.jpg)

 Obedio research

November 23, 2026

Sidecat, LLC, the Meta Platforms affiliate that has bought land and built data centers around New Albany, Ohio, is asking the Licking County Planning Commission to approve a preliminary plan for a data center of about 620,000 square feet on 199.8 acres in Jersey Township. The case, PP-26-6, is called Project Mink after the road it faces. It is on the commission’s November 23, 2026 agenda.

County planning staff recommend approval with 14 conditions. Several of them go beyond road and drainage work. They would bar groundwater use, set a noise limit at nearby homes, limit when backup generators can run, and require a decommissioning plan backed by a bond.

At a Glance

• Case: PP-26-6, Project Mink, Licking County Planning Commission, November 23, 2026

• Applicant: Sidecat, LLC, a Meta Platforms affiliate, represented by Arup

• Building: about 620,000 square feet on 199.8 acres

• Land: about 322 acres in 19 parcels owned by Sidecat, including the power plant site

• Location: east side of Mink Street between Jug Street and Beaver Road, Jersey Township

• Power: a 500 MW gas plant next door, with no connection to the public grid

• Investment and jobs: over $800 million and 50 full-time equivalent jobs, per the staff report

• Staff recommendation: approval with 14 conditions

## What Sidecat Is Asking For

The request is for a preliminary plan under Section 302.4 of the Licking County Subdivision Regulations. It covers 19 parcels. The site plan shows one main data center building along Mink Street. Between that building and the power plant site to the east are a mechanical yard and areas for logistics and contractors. The main entrance would line up with Clover Valley Road and serve both the data center and the power plant. It would include a guardhouse, an administration building, shipping and receiving, and a power utility yard. A second entrance on Jug Street, at the north end of the site, would be for emergency use only.

The plans were prepared by Arup as civil engineer, with Terracon as geotechnical engineer and GRW Engineers as surveyor. They list the developer as Sidecat, LLC at 1 Hacker Way, Menlo Park, California, which is Meta’s headquarters address.

Staff note that a preliminary plan is valid for 24 months. Sidecat also has a separate application pending for mass grading (CON-26-31). County staff will not sign construction plans until the preliminary plan is approved. If grading starts before final construction documents are signed, Sidecat takes on the risk and cost of any later changes.

## How the Site Was Put Together

The land was zoned for this use more than a year ago, and the zoning application came from the township. On June 23, 2025, the Jersey Township Zoning Commission asked the county planning commission for a non-binding recommendation on moving about 160.78 acres near Mink Street and Jug Street from the Mink Street Corridor Overlay (Subarea B) into the Innovation Employment (IE) overlay. County staff found the change did “not technically conform” to the township’s comprehensive plan, which showed the area as Mink Street Mixed Use, but recommended approval because the two overlays allow similar uses. The commission voted 11-0 to recommend it, on the condition that the township document its reasons for departing from its plan and consider updating that plan. Jersey Township rezoned the site in July 2025.

The June 2025 staff report listed the owners at the time as individual families and an LLC, BC Mink Street LLC. By October 2026 the county’s records showed Sidecat owning 19 parcels totaling about 322 acres, including many of the same parcel numbers. The land is now in the IE subarea of the township’s Worthington Corridor Overlay District, where data centers are a permitted use. The township must still approve a Development Plan.

On October 26, 2026 the commission voted 9-0 to approve a replat of Hodge Estates, a two-lot home subdivision recorded in 2012, that combined the 19 parcels into two lots. Staff explained that Ohio law no longer allows a recorded plat to be eliminated, so the land had to be replatted instead. Under the November staff report, the data center sits on the lot along Mink Street and about 120 acres are set aside for the Neo Power Generation Facility. The October replat report labels and sizes the two lots differently, so the final recorded plat is the document to check. Conditions of the replat included removing a plat note that barred further subdivision for new home lots and requiring preliminary plan approval before any mass grading. The replat also adds 10 feet of right-of-way along Beaver Road and Jug Street and sets a 50-foot streambank buffer and a 75-foot no-disturb floodplain buffer along the stream at the south end. The property falls in two school districts, Johnstown-Monroe Local and Northridge Local.

Jersey Township trustee minutes show the groundwork for the site in early 2026. At the March 2, 2026 meeting, the township administrator reported a Will-Power/Williams pipeline purge scheduled for March 3, and a representative of Hicks Partners presented a future gas line project with Energy Co-Op. The preliminary plan now shows a proposed 50-foot Energy Cooperative gas easement across the site, along with a 15-foot fiber easement and Licking Regional Water District water and sewer easements. At the April 6, 2026 meeting, a resident asked about the roughly 500 acres recently purchased by Meta. The minutes record that the township administrator had met with the developer about economic development on those properties and that gas lines had been installed in the area to support development.

The IE District sets a 100-foot building setback from the road right-of-way and 60-foot side and rear setbacks, rising to 100 feet next to homes. Staff say the plan complies. Buildings can be 60 feet tall, plus 10 feet for rooftop equipment.

## Power: Its Own Plant, No Grid Connection

The data center would run entirely on power made next door. Will-Power OH, LLC, a subsidiary of Williams Companies, has applied to the Ohio Power Siting Board (case 26-0627-EL-BGN) for the Neo Power Generation Facility. In its May 2026 pre-application letter, Will-Power described a 500 MW simple-cycle natural gas plant paired with a 260 MW battery energy storage system, with construction starting in the first quarter of 2027 and commercial operation in the second quarter of 2028. The board held a local public hearing on October 6, 2026 and an evidentiary hearing on October 21, 2026.

Local governments took part in that state case. According to the October 2026 county staff report, the Licking County Commissioners, the county planning commission, the County Engineer, the Soil and Water Conservation District, the City of New Albany and Jersey Township all intervened, and after two weeks of negotiation signed a Joint Stipulation with Will-Power and the board’s staff. The county report says an administrative law judge approved it. The stipulation, included in the county packet, recommends that the board certify the plant with conditions that include:

- Output capped at 500 MW, and no physical or electrical connection to the PJM transmission system, apart from temporary construction power of up to 5 MW.
- Plant noise at non-participating neighbors no higher than measured nighttime ambient levels plus 5 dBA, up to a maximum of 55 dBA, with monitoring after the plant starts operating.
- Construction from 7 a.m. to 7 p.m., with pile driving and similar work limited to 10 a.m. to 5 p.m.
- Construction traffic limited to Mink Street, Jug Street and Beaver Road, and super loads limited to Mink Street, unless the County Engineer agrees otherwise.
- A bonded decommissioning plan for the battery system, with the bond recalculated every five years and equipment removed within 12 months.
- No impacts to Category 3 wetlands, quarterly complaint reports through the first five years of operation, and loss of the certificate if construction has not started within five years.

The county report describes the battery system as a 260 MW Tesla system. The stipulation lists Will-Power’s application as filed June 23, 2026 and the board staff’s report of investigation as issued October 1, 2026.

The county staff report says a 24-inch natural gas pipeline on the adjacent lot will feed the plant, that the plant will produce all the power the data center needs, and that there are no Ohio Power transmission lines tied to the project and no connection to the public grid.

The Reporting Project, a Licking County news outlet, reported figures from the plant’s air permit application to the Ohio EPA, including projected greenhouse gas emissions of 3,471,813 tons. Air permits are handled by the state, and the staff report asks that copies of all required emissions reports be sent to the county planning commission.

## Water and Cooling

According to the staff report, the building will use a closed-loop cooling system with a glycol solution and dry coolers, and no groundwater. Licking Regional Water District would supply water and sewer service through an extension along Mink Street. Estimated water use is 10 million gallons a year, averaging 25,000 gallons a day, with a peak of 380,000 gallons a day that includes fire demand. Fire tanks and a pump house on site would connect to public water.

Staff go further than the applicant’s own description. They recommend that no State of Ohio groundwater permits be allowed for the site, and that Sidecat sign an agreement with the water district setting usage limits that protect the area’s aquifers and supply. Staff also recommend a ban on fracking, injecting operational waste underground, and discharging operational waste into surface water or the storm system.

The stormwater report Arup filed with the plan describes the site as about 211 acres of mostly farmland that drains north toward Jug Street and southwest to an unnamed creek that feeds the South Fork of the Licking River. The plan allows for up to 164 acres of hard surface, managed by four wet detention basins that start as sediment basins during construction. The report states that wetland impacts in the disturbance area “have been evaluated and permitted separately” through the Ohio EPA, and that the proposed release rates are below the allowable rates for every storm modeled.

## Noise, Generators and Fire Safety

Sidecat told the county its acoustics study is still being refined, and that it expects noise at nearby homes to be at or below 55 dBA. Staff recommend a sound monitoring plan that shows levels at or below both 55 dBA and 55 dBC at residential properties. The dBC measure picks up low-frequency sound, such as the hum from cooling and electrical equipment, which the more common dBA measure tends to understate. In the copy of the township’s overlay text included in the county packet, the noise section is written for the Commercial-Professional Office subarea, not the IE subarea where this site sits. The county condition would set a limit for the data center itself, separate from the plant’s state limit.

The site will have three diesel backup generators. Staff recommend that they run only during outages and emergencies, with testing limited to weekdays from 9 a.m. to 5 p.m., and that they never be used to support grid operations.

Staff also note that Sidecat has not yet provided information on fire hazards such as battery systems. They recommend that the fire district approve an emergency response plan before the facility opens, and that Sidecat pay for any equipment, training or staff the district needs.

## Roads During Construction

The staff report expects about 1,000 construction workers, plus material laydown yards, parking, and a large number of oversize loads and super loads. Staff recommend a Road User Maintenance Agreement that includes a construction traffic plan agreed to by the County Engineer and the township, permits for every temporary and permanent access point and every oversize load, and bonds to rebuild any damaged roads.

Mink Street was recently widened to four lanes with medians and turn lanes. The traffic impact study is not complete. Staff say Sidecat will have to make any road improvements required by ODOT, the City of New Albany and the County Engineer. Jug Street would get road, curb, drainage and a 10-foot multi-use path.

## What Else Is Moving Around the Site

Other local records show related activity close to Project Mink:

- **County planners opposed a further IE expansion.** On September 28, 2026 the county planning commission voted 10-1 to recommend against adding about 141 acres at the southwest corner of Jug Street and Burnside Road to the IE overlay. The request came from the Jersey Township Zoning Commission on behalf of a petition that, according to the township, was signed by almost all of the residents of the 26 parcels involved. County staff said the township’s plan calls for single-family homes on three-acre lots there, that about 940 acres already in the IE overlay are largely undeveloped, and that public sewer is not yet available. Staff also flagged two parcels, about 16 acres, that would be left out of every overlay on the advice of the township’s legal counsel and sit between the Neo plant site and land expected to develop. At the meeting, Township Administrator Rob Platte argued for approval and said one trustee owns property in the area, which is why only two trustees moved it forward. The recommendation is non-binding, and the trustees scheduled their own hearing for November 9, 2026. The township is working with NBBJ on a master plan expected in 2027.
- **Annexation just to the west.** The City of New Albany’s May 5, 2026 council agenda listed the second reading of Ordinance O-03-2026, which would annex 106.4 acres from Jersey Township, and Ordinance O-07-2026, which would rezone that land, northeast of Jug Street and Clover Valley Road, to Limited General Employment as the “Clover Valley East Zoning District” for Lincoln Property Company.
- **Road work at the main entrance.** The Licking County Commissioners’ October 1, 2026 agenda included awarding a Clover Valley Road resurfacing contract to Kokosing Construction. Project Mink’s main entrance would line up with Clover Valley Road at Mink Street.
- **Water supply.** At the April 6, 2026 Jersey Township meeting, a resident asked about properties in St. Albans Township being tested by the Licking Regional Water District for water well fields. Trustee Dan Wetzel said the township is not involved in that work. The same water district would serve Project Mink.

## The 14 Conditions

| # | Condition (summarized from the staff report) |
| --- | --- |
| 1 | Road and drainage improvements along Jug Street |
| 2 | Wetland buffers and easements; pre- and post-construction study of Category 3 wetlands |
| 3 | Limit stormwater impacts on the South Fork watershed |
| 4 | Fix any field tiles cut by construction |
| 5 | Recorded stormwater operations and maintenance agreement |
| 6 | Road User Maintenance Agreement, a completed traffic study, and all required road improvements |
| 7 | No groundwater for cooling and no state groundwater permits |
| 8 | Water and sewer agreement with Licking Regional Water District covering usage and waste discharge |
| 9 | No fracking, underground waste injection, or waste discharge to surface water or storm sewers |
| 10 | Fire district-approved emergency response plan, with resources paid by the applicant |
| 11 | Sound monitoring showing no more than 55 dBA and 55 dBC at nearby homes |
| 12 | Generators limited to outages, emergencies and weekday daytime testing; no grid support |
| 13 | County-approved decommissioning plan with a bond |
| 14 | Final landscaping and screening details |

## Why It Matters for Site Selectors and Developers

Project Mink shows the terms a county planning office in central Ohio is now attaching to a data center that already has its zoning. Data centers are a permitted use on this site, so the county’s review is limited to the subdivision process. Within that process, staff have recommended conditions that many jurisdictions write into a zoning ordinance: a groundwater ban, a dual dBA and dBC noise standard measured at homes, set generator testing hours, and a bonded decommissioning plan.

The staff report gives a reason for the decommissioning condition. It says that given how quickly data center technology changes, the site’s long-term viability for continued use is questionable.

The project also shows what a fully off-grid campus looks like in the record. The plan relies on a behind-the-meter gas plant on the next lot, approved by a separate state board, with no utility transmission work.

## The Risks and Obstacles

- **Work still to be done.** The traffic study, acoustics study, decommissioning plan and emergency response plan were not finished when the staff report was written.
- **State approval of the power plant.** The data center has no grid backup in the plan. It depends on the Ohio Power Siting Board certificate for the Neo plant.
- **No fiscal impact study.** Staff note that none was provided to show costs or benefits to local governments, the school district or the fire district.
- **Wetlands and drainage.** The staff report says the plan preserves a wetland in the center of the site and that Sidecat must get any needed U.S. Army Corps of Engineers and Ohio EPA approvals. The Reporting Project reported that the site plan shows about a dozen wetlands, two ponds and a stream that the company proposes to remove, and Arup’s stormwater report says wetland impacts were permitted separately through the Ohio EPA. Staff also flagged that the grading would send some stormwater south into the South Fork watershed.
- **Local opposition to data centers nearby.** Neighboring St. Albans Township has moved to ban data centers. The county planning commission recommended approval of that zoning change in February 2026.

## What to Watch

- The commission’s vote on November 23, 2026, and whether all 14 conditions are kept as written.
- The Ohio Power Siting Board’s decision on the Neo Power Generation Facility, and whether it adopts the Joint Stipulation without changes.
- Jersey Township’s Development Plan review, which covers architecture, screening and other zoning details.
- The outcome of Jersey Township’s November 9, 2026 hearing on expanding the Innovation Employment area.
- The water agreement with Licking Regional Water District and whatever usage limits it sets.
- Whether more buildings follow. A June 2026 wetlands permit application to the Ohio EPA by Mink Street Land Company, LLC, as reported by ABC 6 and The Fallout Files, described a six-building campus of about 1.66 million square feet on a roughly 399-acre site in the same area, with construction from December 2026 through November 2031. The current preliminary plan covers one building.

This article is factual background and is not legal, financial, or investment advice.

## Share this post

<https://www.facebook.com/sharer/sharer.php?u=https%3A%2F%2Fhs.getobedio.com%2Fblog%2Fmetas-project-mink-data-center-goes-to-licking-county-planners-with-14-conditions-attached><https://twitter.com/intent/tweet?url=https%3A%2F%2Fhs.getobedio.com%2Fblog%2Fmetas-project-mink-data-center-goes-to-licking-county-planners-with-14-conditions-attached><https://www.linkedin.com/shareArticle?mini=true&url=https%3A%2F%2Fhs.getobedio.com%2Fblog%2Fmetas-project-mink-data-center-goes-to-licking-county-planners-with-14-conditions-attached><https://pinterest.com/pin/create/button/?url=https%3A%2F%2Fhs.getobedio.com%2Fblog%2Fmetas-project-mink-data-center-goes-to-licking-county-planners-with-14-conditions-attached>[mailto:https%3A%2F%2Fhs.getobedio.com%2Fblog%2Fmetas-project-mink-data-center-goes-to-licking-county-planners-with-14-conditions-attached](mailto:https%3A%2F%2Fhs.getobedio.com%2Fblog%2Fmetas-project-mink-data-center-goes-to-licking-county-planners-with-14-conditions-attached)

## Keep reading

### [Local Ordinance New Jersey Data Center Vineland Council Votes Tuesday on Making DataOne Pay the City's Professional Costs for Its 300 MW AI Data Center](https://hs.getobedio.com/blog/vineland-council-votes-tuesday-on-making-dataone-pay-the-citys-professional-costs-for-its-300-mw-ai-data-center)

### [Data Center Virginia Development Data Staunton, Virginia, Writes a Data Center Ban Into a Shopping Center Deal](https://hs.getobedio.com/blog/staunton-virginia-writes-a-data-center-ban-into-a-shopping-center-deal)

[![Obedio your municipal data source](https://hs.getobedio.com/hs-fs/hubfs/google%20workspace-1.png?width=100&height=41&name=google%20workspace-1.png "Obedio your municipal data source")](https://getobedio.com)

Obedio's business intelligence platform provides data and insights from over 25,000 municipalities, enabling retail, manufacturing, finance, real estate, and government clients to make informed decisions, assess risk, and identify opportunities.

<https://www.linkedin.com/company/getobedio/><https://getobedio.com/demo>

**Data Source & Liability Disclaimer:** The data presented on this website is aggregated from various official government and public entities ("The Original Government Sources"). This data may have been modified for use from its original source. The Original Government Sources do not vouch for the quality, accuracy, or timeliness of the data as presented here.

All data is provided "as is." Neither Global Regulatory Risk Advisors, Inc. (d/b/a Obedio) nor The Original Government Sources make any representations or warranties as to the completeness, accuracy, or content of any data made available through this site. All warranties, whether express or implied, including implied warranties of merchantability or fitness for a particular purpose, are expressly disclaimed.

**Usage & Intellectual Property:** While the underlying facts are public records, the specific compilation, organization, and presentation of this information are proprietary to **Global Regulatory Risk Advisors, Inc. (d/b/a Obedio)**. Any unauthorized copying, distribution, or display of this proprietary presentation is prohibited.

 

Copyright © 2018–2026 Global Regulatory Risk Advisors, Inc. (d/b/a Obedio) [|](https://getobedio.com/privacy)[Terms of Service](https://getobedio.com/terms)[|](https://getobedio.com/privacy)[Privacy Policy](https://getobedio.com/privacy)<https://getobedio.com/privacy>

Privacy Policy · Legal · © 2025. All rights reserved.

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Obedio research",
    "url" : "https://hs.getobedio.com/blog/author/obedio-research"
  },
  "dateModified" : "2026-11-23T19:21:25.765Z",
  "datePublished" : "2026-11-23T19:21:25.000Z",
  "headline" : "Meta’s 500MW Project Mink Data Center Goes to Licking County Planners With 14 Conditions Attached",
  "mainEntityOfPage" : {
    "@id" : "https://hs.getobedio.com/blog/metas-project-mink-data-center-goes-to-licking-county-planners-with-14-conditions-attached",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://hs.getobedio.com/hubfs/google%20workspace-1.png"
    }
  }
}
```

```json
{
  "@context" : "https://schema.org",
  "@id" : "https://hs.getobedio.com/blog/metas-project-mink-data-center-goes-to-licking-county-planners-with-14-conditions-attached#breadcrumb",
  "@type" : "BreadcrumbList",
  "itemListElement" : [ {
    "@type" : "ListItem",
    "item" : "https://www.getobedio.com/",
    "name" : "Home",
    "position" : 1
  }, {
    "@type" : "ListItem",
    "item" : "https://hs.getobedio.com/blog",
    "name" : "Blog",
    "position" : 2
  }, {
    "@type" : "ListItem",
    "item" : "https://hs.getobedio.com/blog/metas-project-mink-data-center-goes-to-licking-county-planners-with-14-conditions-attached",
    "name" : "Meta’s 500MW Project Mink Data Center Goes to Licking County Planners With 14 Conditions Attached",
    "position" : 3
  } ]
}
```